Dissemination

Exploitable results

Title
Author       
Project Partners Involved
Source 
Date    
Resource
AISSI Platform Interface Specification
 
Robert Bosch GmbH, D-SIMLAB Technologies Pte Ltd
AISSI project
02.05.2024
 
 
Demonstration on how to use the AISSI Platform Interface Specification
 
Robert Bosch GmbH, D-SIMLAB Technologies Pte Ltd
AISSI project
02.05.2024

Journal publications, conference proceedings and articles

Title
Author       
Project Partners Involved
Source 
Date    
Resource
 
Graph Representation and Embedding for Semiconductor Manufacturing Fab States



 
 
B. Schulz,
C. Jacobi,
A. Gisbrecht,
A. Evangelos,
C. Chan,
B. Gan
 
Karlsruhe Institute of Technology (KIT), Robert Bosch GmbH, D-SIMLAB Technologies Pte Ltd)


 
 
IEEE




 
 
23.01.2023




 
 
To batch or not to batch? Real-time continuous batch optimization in a semiconductor work center environment


 
H. Brandl,
P. Rossbach,
H. Terbrack


 
Systema GmbH




 
20. ASIM
Dedicated
Conference on
Simulation in Production
and Logistics
14.09.2023




 
Halbleiteroffensive mit KI(T) (german)
 
K. Janz
 
Karlsruhe Institute of Technology (KIT), Robert Bosch GmbH
KIT-NEULAND Magazin
01.12.2023
 
Mobilizing semiconductor factories with AI

 
K. Janz,
C. Jacobi,
A. Gisbrecht
Karlsruhe Institute of Technology (KIT), Robert Bosch GmbH
 
KIT RESEARCH TO BUSINESS
 
09.01.2024

 

Public Project Deliverables

Title
Author       
Project Partners Involved
Source 
Date    
Resource
 
Updated State-of-the-Art analysis
(D1.1)
 
C. Jacobi,
B. Schulz
 
   Karlsruhe Institute of Technology (KIT)
 
 
AISSI project
WP 1
 
21.10.2021
 
 
 
Intermediate report on dissemination activities
(D4.1)

 
B. Schulz,
C. Senger,
K. Leonardi,
G. Luhn,
A. Gisbrecht
Karlsruhe Institute of Technology (KIT),
Nexperia GmbH, Systema GmbH, Robert Bosch GmbH

 
AISSI project
WP 4



 
30.11.2022



 

Talks and Presentations at Workshops and Conferences

Title                                        
Author    
Project Partners Involved
Source
Date   
Resource

Session III – AI application develop-
ment | DataOps vs.
DevOps
 

A. Gisbrecht

 

Robert Bosch GmbH

 

ITEA Smart Systems
Engineering work-
shop (session replay)

07.04.2022

 

Visit

 
Maximizing throughput, due date
compliance and other partially
conflicting objectives in
semiconductor production
H. Brandl,
H. Terbrack,
P. Roßbach,
T. Sprogies
SYSTEMA GmbH,
Nexperia Germany GmbH

 
Winter Simulation
Conference


 
12.12.2022


 
Graph Representation and Embedding
for Semiconductor Manufacturing
Fab States



 
B. Schulz,
C. Jacobi,
A. Gisbrecht,
E. Angelidis,
C. W. Chan,
B.P. Gan
Karlsruhe Institute of Technology (KIT),
Robert Bosch GmbH,
D-SIMLAB Technologies Pte Ltd



 
Winter Simulation
Conference




 
13.12.2022




 
Optimizing semiconductor production
using AI and scheduling to balance
competing goals

 
H. Brandl


 
Systema GmbH, Nexperia GmbH


 
20th Innovation Forum
for Automation


 
27.01.2023


 
Make more money by modeling
and optimizing your business
processes with Kotlin

 
H. Brandl


 
Systema GmbH


 
KotlinConf’23


 
14.04.2023


 
Sustainability is the new normal in
high-volume semiconductor front end
production: Balancing WIP flow for
energy availability, cost and peak consumption
H. Terbrack,
H. Brandl,
T. Sprogies,
K. Leonardi

 
Systema GmbH, Nexperia Germany GmbH


 
16.-18.04.2024